Ceoner Valley Residence
Completed[[İLÇE]] / [[ŞEHİR]] · 2024
Ceoner Valley Residence is one of the first large-scale housing projects our company completed. Made up of 16 units in a single block, excavation began in early 2023 and the building was handed over to owners by the end of 2024.
The project was completed on the committed schedule and without cost overruns — a concrete example, for us, of a promise kept on site.
Project Details
- Unit Types
- 2+1, 3+1
- Blocks / Floors
- 1 block / 7 floors
- Total Units
- 16
- Start
- 02.2023
- Handover
- 11.2024
Unit Features
- —Wide combined living room and kitchen
- —Master bedroom with en-suite bathroom
- —1 enclosed parking space per unit
Site Features
- —Enclosed parking
- —On-site walkway
- —Camera security system